Montura THFXL1660 Method XL In-Line Long, Leadfree 35lbs

Disponibilitate: in stoc (magazin, depozit)
Vezi detalii stoc & livrare
loader
Se incarca...

Producator

1499Lei
Incepand de la: 1199Lei
Disponibilitate: in stoc (magazin, depozit)
Vezi detalii stoc & livrare
loader
Se incarca...
SKU:
LZY8111-configurable
Varianta Pret Stoc Cantitate
Nr.6 60g
LZY8111
Pret special 1199Lei
Pret standard 1499Lei
in stoc (magazin, depozit)
- +
Nr.8 50g
LZY8104
Pret special 1199Lei
Pret standard 1499Lei
in stoc (magazin, depozit)
- +
loader
Se incarca...
Subscribe to back in stock notification configurable form

Beneficii

  • Retur GRATUIT in 30 de zile detalii
  • Livrare rapida si GRATUITA prin curier detalii
  • Poti ridica produsele dorite in magazinul din Bucuresti detalii
  • Plata cu cardul in 6 rate fara dobanda detalii
  • Consultanta telefonica oferita de pescari 0374.90.10.90

Vrei ceva mai bun?

Navigating through the elements of the carousel is possible using the tab key. You can skip the carousel or go straight to carousel navigation using the skip links.
40g
50g
60g
Pana la -20%
Montura Method Feeder Benzar Rapid Method Rig, Carlig nr.10
4.33
Incepand de la 1359Lei Pret standard 1699Lei
in stoc (magazin)
40g
50g
60g
Pana la -20%
Montura Smax Method Feeder Clasic cu Tija, Nr.8
5
Incepand de la 1279Lei Pret standard 1599Lei
in stoc (magazin, depozit)
40g
50g
65g
Pana la -20%
Montura Method Feeder Benzar Rapid Longcast, Carlig nr.10
4.85
Incepand de la 1599Lei Pret standard 1999Lei
in stoc (magazin, depozit)
30g
40g
60g
70g
Pana la -20%
Montura Smax Method Feeder Leadcore Premium, Nr.8
4
Incepand de la 1359Lei Pret standard 1699Lei
in stoc (magazin, depozit)
50g
80g
Pana la -20%
Montura Lazy Fish Method In-Line Long
Incepand de la 1279Lei Pret standard 1599Lei
in stoc (magazin, depozit)
50g
Pana la -20%
Montura Smax Method Feeder, Carlig Nr.8
5
Incepand de la 1439Lei Pret standard 1799Lei
in stoc (magazin, depozit)
30g
45g
60g
Pana la -20%
Montura Method Benzar Mix Rapid Method ARC XL Rig, Nr.8
Incepand de la 1839Lei Pret standard 2299Lei
in stoc furnizor
Nr.6
Nr.8
Pana la -15%
Montura Filfishing Feeder Rig, 55g
5
Incepand de la 1359Lei Pret standard 1599Lei
in stoc (magazin, depozit)
-20%
Montura pentru Somn cu Pluta Uriasa Koos
5
Pret special 5279Lei
Pret standard 6599Lei
in stoc (magazin, depozit)
100g
120g
150g
NOU Pana la -20%
Montura Crap-Caras Dunare cu Momitor Placa Canoe, Carlig Nr.4, 1buc/plic
Incepand de la 1439Lei Pret standard 1799Lei
in stoc (magazin, depozit)

Descriere caret-down

Montura THFXL1660 Method XL In-Line Long, Leadfree 35lbs

Montura Lazy Fish THFXL1660 Method XL in-line long 60g este conceputa pentru pescuitul crapului la feeder, oferind o asezare stabila pe substrat si o prezentare eficienta a nadei in zona carligului. Echipata complet si realizata pentru utilizare practica, aceasta montura este potrivita pentru partidele desfasurate pe lacuri sau in ape cu curent redus.

Caracteristici:

  • Tip produs: montura crap method feeder;
  • Model: THFXL1660;
  • Producator: Lazy Fish;
  • Sistem: Method XL in-line long;
  • Fir de par: inclus;
  • Fir: leadfree 35lb;
  • Montura gata legata;
  • Asezare stabila pe substrat;
  • Prezentare eficienta a nadei;
  • Potrivita pentru lacuri si ape cu curent redus.

Pescarii au luat si…

Navigating through the elements of the carousel is possible using the tab key. You can skip the carousel or go straight to carousel navigation using the skip links.
-13%
Montura Crap MP cu Momitor 65g
4.94
Pret special 1299Lei
Pret standard 1499Lei
in stoc (magazin, depozit)
3 Mix Natural Aroma
Usturoi
Strawberry
Pana la -15%
Groundbait&Pellets Feeder X FiatX Wild Carp, 900g
4.96
Incepand de la 1614Lei Pret standard 1899Lei
in stoc (magazin, depozit)
Small
Medium
Large
X-Large
Pana la -18%
Matrita Incarcare Nada Preston Quick Release Method Mould
4.95
Incepand de la 1877Lei Pret standard 2299Lei
in stoc (magazin, depozit)
Vanilie
Anason
Miere
Crap Capsuni
Usturoi
Baza Crap
Crap Extra
Amur Lucerna
Crap
Crap Caras
Crap Caras Rosu
Big Fish
Faina de Peste
Betain Crap
Scoica
Amur Crap
Panettone Carp Black
River
Mreana Scobar Cascaval
Scobar
Special Platica
Oblete
Special Concurs
Special Feeder
Belachan Carp
Crap Caras Negru
Novac Sangerbusa
Concurs Black
Prajit
Scobar Negru
Ice Feeder
Scobar Faina de Sange
Special Morunas Scobar Mreana Parmezan (Maro)
Special Feeder Negru
Ananas
Morunas Mreana Scobar (Verde)
Ciocolata&Portocala
N-Butyric
Novac Sangerbusa Cloudx
Pana la -20%
Nada Benzar Mix 3kg
4.83
Incepand de la 2399Lei Pret standard 2999Lei
in stoc (magazin, depozit)
4000 0.25mm/180m
5500 0.30mm/180m
Pana la -18%
Mulineta Okuma Custom Black Feeder
4.87
Incepand de la 22999Lei Pret standard 27999Lei
in stoc (magazin, depozit)
Usturoi
Tigernuts
Faina de Peste (maro)
Faina de Cereale
Krill
Capsuna
Canepa
Faina de Peste (dulce)
Halibut Squid
Libelula si Vierme
Ciocolata Portocala
Frankfurter
Mreana-Parmezan
Fitofag-Efervescenta
Pana la -25%
Nada C&B Extra, 1kg
4.7
Incepand de la 1724Lei Pret standard 2299Lei
in stoc (magazin, depozit)
6000 0.30mm/360m
8000 0.40mm/265m
Pana la -10%
Mulineta Okuma Custom Black
4.92
Incepand de la 26999Lei Pret standard 29999Lei
in stoc (magazin, depozit)
0.18mm 4.57kg
0.20mm 5.42kg
0.22mm 6.95kg
0.25mm 8.35kg
0.28mm 9.54kg
0.30mm 11.90kg
0.35mm 15.80kg
0.40mm 20.10kg
Pana la -20%
Fir Monofilament Trabucco T-force XPS Longcast Fluo, 1200m
4.64
Incepand de la 9999Lei Pret standard 12499Lei
in stoc (magazin, depozit)
Vanilie
Anason
Crap-Miere
Crap-Capsuni
Palinca si Miere
Belachan
Usturoi
Baza Crap
Crap-Caras
Crap
Amur-Crap
Scoica
River
Mreana Scobar
Scobar
Crap Caras Rosu
Special Platica
Tutti Fruti
Clean
Faina de Peste
Betain Crap
Crap Extra
Big Fish
Amur Lucerna
Oblete
Special Concurs
Special Feeder
Green Method Mix
Scobar Faina de Sange
Crap Black+pelete Negru
Crap-Caras Negru
Exclusiv Scobar
Special Concurs Negru
Acid Butiric
Panettone Carp Black
Novac Sangerbusa
Special Morunas Scobar Mreana
Special Feeder Negru
Ananas
Morunas Verde
Ciocolata&Portocala
Fine Carp Negru
Fine Carp Galben
Novac Sangerbusa Cloudx
Pana la -20%
Nada Benzar Mix 1kg
4.86
Incepand de la 1119Lei Pret standard 1399Lei
in stoc (magazin, depozit)
-35%
Suport Lanseta Delphin Bolder
4.87
Pret special 518Lei
Pret standard 799Lei
in stoc (magazin, depozit)

Produse similare

Navigating through the elements of the carousel is possible using the tab key. You can skip the carousel or go straight to carousel navigation using the skip links.
30g
40g
50g
60g
Pana la -20%
Montura Smax Method Feeder Clasic, Nr.8
5
Incepand de la 1199Lei Pret standard 1499Lei
in stoc (magazin, depozit)
40g
50g
60g
Pana la -20%
Montura Method Feeder Benzar Rapid Method Rig, Carlig nr.10
4.33
Incepand de la 1359Lei Pret standard 1699Lei
in stoc (magazin)
40g
50g
60g
Pana la -20%
Montura Smax Method Feeder Clasic cu Tija, Nr.8
5
Incepand de la 1279Lei Pret standard 1599Lei
in stoc (magazin, depozit)
40g
50g
65g
Pana la -20%
Montura Method Feeder Benzar Rapid Longcast, Carlig nr.10
4.85
Incepand de la 1599Lei Pret standard 1999Lei
in stoc (magazin, depozit)
Nr.6
Nr.8
Pana la -20%
Montura Smax Caras/Platica cu Arc Naditor si 2 Carlige
5
Incepand de la 639Lei Pret standard 799Lei
in stoc (magazin, depozit)
2/0
3/0
Pana la -20%
Montura pentru Salau Smax
5
Incepand de la 1119Lei Pret standard 1399Lei
in stoc (magazin, depozit)
Nr. 1/0 85g
Nr. 3/0 105g
Pana la -20%
Montura Smax pentru Somn, 1buc/blister
5
Incepand de la 1119Lei Pret standard 1399Lei
in stoc (magazin, depozit)
0.5g 0.12mm Nr.18
1g 0.14mm Nr.16
1.5g 0.18mm Nr.14
3g 0.20mm Nr.12
Pana la -36%
Linie Pentru Varga Delphin FloatGo, 6m
Incepand de la 773Lei Pret standard 1199Lei
in stoc (magazin, depozit)
30g
40g
60g
70g
Pana la -20%
Montura Smax Method Feeder Leadcore Premium, Nr.8
4
Incepand de la 1359Lei Pret standard 1699Lei
in stoc (magazin, depozit)
Nr. 8
Pana la -20%
Montura Smax Cosulet Feeder, 1bucplic
Incepand de la 1359Lei Pret standard 1699Lei
in stoc (magazin, depozit)

Rating general al produselor

Adauga un review

Adauga un review

Spune-ne parerea ta despre acest produs Montura THFXL1660 Method XL In-Line Long, Leadfree 35lbs
Review-ul tau:
0/15 cuvinte

Parerea ta este importanta!

Ajuta-i pe altii cu o parere sincera despre acest produs.

- Se ridica la nivelul asteptarilor tale?
- Esti multumit de calitate avand in vedere pretul platit?
- Ai recomanda si altora?
- Ce avantaje si/sau dezavantaje ai observat la produs?
- Pe ce perioada si/sau de cate ori ai folosit produsul?
- Ti-ai fi dorit sa aiba sau sa ofere ceva in plus?

Toate review-urile, fie ele pozitive sau negative vor fi postate pe site.
Iti multumim.
loader
Se incarca...

Ai trimis un review pentru verificare.

Intrebari si raspunsuri

Adauga intrebare

Click aici
Se incarca...